{"id":4358,"date":"2022-03-06T22:43:10","date_gmt":"2022-03-06T22:43:10","guid":{"rendered":"https:\/\/bildwpaquabokalocal.local\/?p=4358\/"},"modified":"2022-03-06T22:43:10","modified_gmt":"2022-03-06T22:43:10","slug":"exchange-project-reconstructs-aquarium-boka","status":"publish","type":"post","link":"https:\/\/aquariumboka.ucg.ac.me\/en\/exchange-project-reconstructs-aquarium-boka\/","title":{"rendered":"EXChAngE Project reconstructs Aquarium Boka"},"content":{"rendered":"<p>The Aquarium Boka is upgrading as part of a works contract financed by the <a href=\"http:\/\/exchange.imp-du.com\/\">EXChAngE <\/a>project. Institute\u2019s contractor, Dema doo Kotor, is implementing complex works for the reconstruction and extension of Aquarium Boka, which includes the reconstruction of two rooms, building stone facade, and aquarium park.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-4354\" src=\"http:\/\/aquariumboka.ucg.ac.me\/wp-content\/uploads\/2022\/03\/EXChAngE-IMB-works-plate.jpg\" alt=\"\" width=\"461\" height=\"1024\" srcset=\"https:\/\/aquariumboka.ucg.ac.me\/wp-content\/uploads\/2022\/03\/EXChAngE-IMB-works-plate.jpg 461w, https:\/\/aquariumboka.ucg.ac.me\/wp-content\/uploads\/2022\/03\/EXChAngE-IMB-works-plate-135x300.jpg 135w, https:\/\/aquariumboka.ucg.ac.me\/wp-content\/uploads\/2022\/03\/EXChAngE-IMB-works-plate-370x822.jpg 370w\" sizes=\"(max-width: 461px) 100vw, 461px\" \/><\/p>\n<p>Works will improve Aquarium installations including thermal pumps for water heating and cooling. Works will refresh the splendor of the stone facade of the Radoni\u010di\u0107 Palace which was built at the beginning of the 19th century.<\/p>\n<figure id=\"attachment_4355\" aria-describedby=\"caption-attachment-4355\" style=\"width: 461px\" class=\"wp-caption alignnone\"><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-4355\" src=\"http:\/\/aquariumboka.ucg.ac.me\/wp-content\/uploads\/2022\/03\/EXChAngE-IMB-Facade.jpg\" alt=\"\" width=\"461\" height=\"1024\" srcset=\"https:\/\/aquariumboka.ucg.ac.me\/wp-content\/uploads\/2022\/03\/EXChAngE-IMB-Facade.jpg 461w, https:\/\/aquariumboka.ucg.ac.me\/wp-content\/uploads\/2022\/03\/EXChAngE-IMB-Facade-135x300.jpg 135w, https:\/\/aquariumboka.ucg.ac.me\/wp-content\/uploads\/2022\/03\/EXChAngE-IMB-Facade-370x822.jpg 370w\" sizes=\"(max-width: 461px) 100vw, 461px\" \/><figcaption id=\"caption-attachment-4355\" class=\"wp-caption-text\">Reconstruction of the stone facade<\/figcaption><\/figure>\n<p>Two new exhibition pavilions will be installed in the park as part of the Aquarium outdoor exhibition.<\/p>\n<figure id=\"attachment_4357\" aria-describedby=\"caption-attachment-4357\" style=\"width: 1024px\" class=\"wp-caption alignnone\"><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-4357\" src=\"http:\/\/aquariumboka.ucg.ac.me\/wp-content\/uploads\/2022\/03\/EXChAngE-IMB-works-foundation.jpg\" alt=\"\" width=\"1024\" height=\"461\" srcset=\"https:\/\/aquariumboka.ucg.ac.me\/wp-content\/uploads\/2022\/03\/EXChAngE-IMB-works-foundation.jpg 1024w, https:\/\/aquariumboka.ucg.ac.me\/wp-content\/uploads\/2022\/03\/EXChAngE-IMB-works-foundation-300x135.jpg 300w, https:\/\/aquariumboka.ucg.ac.me\/wp-content\/uploads\/2022\/03\/EXChAngE-IMB-works-foundation-768x346.jpg 768w, https:\/\/aquariumboka.ucg.ac.me\/wp-content\/uploads\/2022\/03\/EXChAngE-IMB-works-foundation-370x167.jpg 370w, https:\/\/aquariumboka.ucg.ac.me\/wp-content\/uploads\/2022\/03\/EXChAngE-IMB-works-foundation-760x342.jpg 760w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption id=\"caption-attachment-4357\" class=\"wp-caption-text\">Foundation for the exhibition pavilion<\/figcaption><\/figure>\n<p>The end of work is planned for the beginning of May 2022.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Aquarium Boka is upgrading as part of a works contract financed by the EXChAngE project. Institute\u2019s contractor, Dema doo Kotor, is implementing complex works for the reconstruction and extension of Aquarium Boka, which includes the reconstruction of two rooms, building stone facade, and aquarium park. Works will improve Aquarium installations including thermal pumps for water heating and cooling. Works&hellip;<\/p>\n","protected":false},"author":6,"featured_media":4356,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[60,163,164],"tags":[184,150,345,344],"acf":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/aquariumboka.ucg.ac.me\/en\/wp-json\/wp\/v2\/posts\/4358"}],"collection":[{"href":"https:\/\/aquariumboka.ucg.ac.me\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aquariumboka.ucg.ac.me\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aquariumboka.ucg.ac.me\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/aquariumboka.ucg.ac.me\/en\/wp-json\/wp\/v2\/comments?post=4358"}],"version-history":[{"count":0,"href":"https:\/\/aquariumboka.ucg.ac.me\/en\/wp-json\/wp\/v2\/posts\/4358\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aquariumboka.ucg.ac.me\/en\/wp-json\/wp\/v2\/media\/4356"}],"wp:attachment":[{"href":"https:\/\/aquariumboka.ucg.ac.me\/en\/wp-json\/wp\/v2\/media?parent=4358"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aquariumboka.ucg.ac.me\/en\/wp-json\/wp\/v2\/categories?post=4358"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aquariumboka.ucg.ac.me\/en\/wp-json\/wp\/v2\/tags?post=4358"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}